Clean-Room Extension

A new extension of CMNT (CMNT – Module 2) is currently under planning. Module 2 will be spatially connected to Module 1 and will provide an additional clean-room of 625 m2 with a maximum class 5 of particulate air cleanliness (as per DIN EN ISO 14644-1) sourrounded by a grey-room of 400 m2. Module 2 is part of the replacement building for the Walter-Schottky-Haus, which is home of the Institute of Materials in Electrical Engineering (Chair I and Chair II), the Institute of Semiconductor Electronics, the Institute of Integrated Photonics and the Teaching and Research Group “GaN Device Technology”. Besides the Module 2, the replacement builing will comprise physical and chemical labs, offices for the institutes mentioned above and seminar rooms for teaching.

The replacement building was designed by kadawittfeldarchitektur. The building principal is the Bau- und Liegenschaftsbetrieb Nordrhein-Westfalen (Niederlassung Aachen). Module 2 is planned by EUROLABORS in cooperation with Planungskontor für Anlagenbau Strickler.


Main entrance of the planned replacement building for the Walter-Schottky-Haus

View from Otto-Blumenthal-Str. The flat building on the right side is the existing Module 1 of CMNT.

 

kadawittfeldbilder

 


Second entrance of the planned replacement building for the Walter-Schottky-Haus

View from Sommerfeldstr.

 

etm_20140523_far_pp_visualisierung-sommerfeldstrase-mit-blb-logo

 


Building plan of the ground floor of the planned replacement building for the Walter-Schottky-Haus

The building plan includes the existing building of CMNT (Module 1). Module 1 and 2 of CMNT are marked by a red rectangle.

 

rrzentrum